Activity

Trans Slim

Download

Trail photos

Photo ofTrans Slim Photo ofTrans Slim Photo ofTrans Slim

Author

Trail stats

Distance
20.69 mi
Elevation gain
8,619 ft
Technical difficulty
Very difficult
Elevation loss
8,609 ft
Max elevation
6,405 ft
TrailRank 
54
Min elevation
6,405 ft
Trail type
One Way
Moving time
13 hours 12 minutes
Time
20 hours 5 minutes
Coordinates
6074
Uploaded
September 16, 2023
Recorded
September 2023
Be the first to clap
Share

near Kampung Kuala Geliting, Perak (မလေးရှား)

Viewed 141 times, downloaded 14 times

Trail photos

Photo ofTrans Slim Photo ofTrans Slim Photo ofTrans Slim

Itinerary description

Trans Slim (Reverse)
Trail Head ➡️ River Crossing ➡️ Kem Sungai Durian ➡️ Gunung Chondong Gelinting ➡️ Kem Dengkur ➡️ Gunung Tumang Batak ➡️ Kem Pisang ➡️ Kem Duit ➡️ Gunung Liang ➡️ Kem 7E ➡️ Gunung Behrang ➡️ Kem Lubuk Hantu ➡️ Trail Head ➡️ Car Park

Trail Head Information:
🚩 Located at Behrang, Perak
🚩 Level of Difficulty: Very Hard 8/10
🚩 Start and ended at diffferent trail head
🚩 Elevation: 1,933 meter
🚩 Trans hiking 33.30 KM in 20 hours

Note:
✴️ Compress day hike. Very difficult. Not for beginner.
✴️ Water point available. Bring 2 litre of water and enough food
✴️ Leeches 🤪
✴️ Need to arrange transport at both side. Either park at both end or ferry by 4WD

List of Mountains:
⛰️ Gunung Chondong Gelinting 1,829 meter
⛰️ Gunung Tumang Batak 1,636 meter
⛰️ Gunung Liang (East & West) 1,933 meter
⛰️ Gunung Behrang 1,500 meter

Time Log:
✳️ 0400 : Meet up
✳️ 0430 : 4WD transferred 🛻
✳️ 0513 : Start
✳️ 0533 : River Crossing*
✳️ 0736 : Con't hike
✳️ 0928 : Kem Sungai Durian 💧
✳️ 1244 : G. Chondong Gelinting ⛰️
✳️ 1257 : Continue
✳️ 1428 : Kem Dengkur 💧⛺
✳️ 1636 : Gunung Tumang Batak ⛰️
✳️ 1731 : Kem Pisang (LWP) 💧
✳️ 1835 : Kem Duit
✳️ 2003 : Gunung Liang East & West ⛰️
✳️ 2028 : Continue
✳️ 2154 : Kem 7E 💧⛺
✳️ 2321 : Gunung Behrang ⛰️
✳️ 2353 : Kem Lubuk Hantu 💧⛺
✳️ 0112 : Trail Head ~ End
✳️ 0118 : Car Park**

Remark:
* Stuck at river side for 2 hours due to high tide. Too dangerous. Waiting for water to recede
** Walk another 6 minutes back to car park

Trans Slim 出发前低估了她的难度,以为并没想象中的那么难。哪知误判了 🤣😂,比起 V1 两者不相上下。

由于是Trans, 必须把车停放两旁。而这次我们安排四轮驱动车载送前往Chondong Gelinting登山口。一开始就一直爬升了直到山顶。但走了大约半小时就卡在了河边,由于涨潮无法度河,只好在地休息。两小时退朝后,大伙决定继续前进。

从Chondong Gelinting 到达 Tumang Batak,需要走约四小时。一直很向往攀顶的山峰,今天终于拿下了。休息填饱肚子后再前往下个山顶Gunung Liang 。从这里开始大雨就不停的一直下,转说梁山路线每到下午四点就会下雨,果然神准。

三小时半后晚上八点终于攻顶了,这时天已暗进入了晚间。此时衣服全湿,天气又非常的冷,十分难受。拍完照后我们就继续出发了,赶在凌晨抵达登山口。差不多走了四小时才抵达最后一个营地 Kem Lubuk Hantu 。眼看着手表显示2353 hrs。。。天啊!!!

无奈的继续前行。。。走着走着一小时后听到了一股很强的流水声,终于抵达了梁山登山口。叹了一口气,以最快的速度回到了停车场,结束了此次被低估的不平凡之旅。

Trail Head Location:
🌐 Sungai Gelinting Water Treatment Plant
🌐 GPS: 3.890812, 101.52517

Permit & Guide:
📝 Permit: Compulsory.
🥷 Guide: Compulsory. 1:7 ratio. Engage with Guide and he will arrange permit

🐺 12 line up. Guide by Zack, event by Rui Peng

📮 hikefuntw@gmail.com

🏁 Saturday, 16 September 2023

Waypoints

PictographDoor Altitude 544 ft
Photo ofTrail Head Photo ofTrail Head Photo ofTrail Head

Trail Head

0513 | Park our car at Gunung Liang trail head & transferred by 4WD to Gunung Chondong Gelinting trail head. 4WD drive distance about 30 minutes

PictographRiver Altitude 848 ft
Photo ofRiver Crossing Photo ofRiver Crossing Photo ofRiver Crossing

River Crossing

0533 hrs | Stuck at river for 2 hrs+ due to rising tide, too dangarois can't cross river ver. No other alternative have to wait here until water recede. 由于河水涨潮无法度河,在此逗留约两小时。 🖼️ 3/6: 0731 hrs manage to crossed after 2 hours of waiting

PictographWaypoint Altitude 1,862 ft
Photo ofAscending To Gunung Chondong Gelinting Photo ofAscending To Gunung Chondong Gelinting Photo ofAscending To Gunung Chondong Gelinting

Ascending To Gunung Chondong Gelinting

Uphill all the way.

PictographFauna Altitude 2,596 ft
Photo ofTortoise Photo ofTortoise

Tortoise

Impressed Tortoise The impressed tortoise occurs in mountainous forest areas in SEA, mainly in Myanmar, Southern China, Thailand, Laos, Vietnam, Cambodia, Malaysia & Northern India. The species has a golden brown shell and skin. - wikipedia

PictographCampsite Altitude 2,581 ft
Photo ofKem Sungai Durian Photo ofKem Sungai Durian Photo ofKem Sungai Durian

Kem Sungai Durian

0928 hrs | Reached. Regroup and break. 🖼️ 4/6: Crossing river (won't getting wet)

PictographWaypoint Altitude 4,844 ft
Photo ofIn The Forest

In The Forest

PictographMountain pass Altitude 5,251 ft
Photo ofView Point Photo ofView Point Photo ofView Point

View Point

🖼️ 4/6: Camera to capture wildlife 🖼️ 5/6: Mossy

PictographSummit Altitude 6,014 ft
Photo ofGunung Chondong Gelinting Photo ofGunung Chondong Gelinting Photo ofGunung Chondong Gelinting

Gunung Chondong Gelinting

Reached 1244 hrs 1st Summit of the day. At 1,829 meter

PictographWaypoint Altitude 5,655 ft
Photo ofDescending Photo ofDescending Photo ofDescending

Descending

🖼️ 2/6: Border Stone 🖼️ 4/6: Clear Marking

PictographFlora Altitude 5,251 ft
Photo ofMossy Plant Photo ofMossy Plant

Mossy Plant

🖼️ 2/6: Mushroom

PictographCampsite Altitude 5,095 ft
Photo ofKem Dengkur Photo ofKem Dengkur Photo ofKem Dengkur

Kem Dengkur

Reached 1428 hrs Small Camp site. Can accommodate about 6 tents. Not an ideal camping area

PictographSummit Altitude 6,379 ft
Photo ofGunung Tumang Batak Photo ofGunung Tumang Batak Photo ofGunung Tumang Batak

Gunung Tumang Batak

Reached 1636 hrs Heavy rain

PictographFountain Altitude 5,386 ft
Photo ofKem Pisang - Last Water Point Photo ofKem Pisang - Last Water Point

Kem Pisang - Last Water Point

1731 hrs Refill water before continue

PictographCampsite Altitude 6,185 ft
Photo ofKem Duit Photo ofKem Duit

Kem Duit

Reached 1835 hrs

PictographMountain pass Altitude 5,868 ft
Photo ofWalking In The Rain

Walking In The Rain

Heavy rain, felling cold

PictographFlora Altitude 6,140 ft
Photo ofGiant Plant

Giant Plant

PictographSummit Altitude 6,375 ft
Photo ofGunung Liang East Photo ofGunung Liang East Photo ofGunung Liang East

Gunung Liang East

🖼️ 4/6: Little Cute Dinasour

PictographSummit Altitude 6,376 ft
Photo ofGunung Liang West Photo ofGunung Liang West Photo ofGunung Liang West

Gunung Liang West

Reached 2018 hrs

PictographCampsite Altitude 4,592 ft
Photo ofKem 7E Photo ofKem 7E

Kem 7E

Reached 2153 hrs

PictographSummit Altitude 2,400 ft
Photo ofGunung Behrang

Gunung Behrang

Reached 2321 hrs 1,500 meter

PictographRiver Altitude 1,866 ft
Photo ofStream Crossing

Stream Crossing

Reached 2347 hrs

PictographCampsite Altitude 1,896 ft
Photo ofKem Lubuk Hantu

Kem Lubuk Hantu

Reached 2353 hrs Huge campsite beside river Ideal camping area

PictographRiver Altitude 1,383 ft
Photo ofSmall River Crossing

Small River Crossing

PictographDoor Altitude 755 ft
Photo ofGunung Liang Trail Head Photo ofGunung Liang Trail Head

Gunung Liang Trail Head

Reached 0112 hrs

PictographCar park Altitude 619 ft
Photo ofCar Park Photo ofCar Park

Car Park

Reached 0118 hrs From trail head walk for another 6 minutes and ended our hike here. Can wash and shower here beside river

Comments

    You can or this trail