Trans Slim
near Kampung Kuala Geliting, Perak (မလေးရှား)
Viewed 141 times, downloaded 14 times
Trail photos
Itinerary description
Trail Head ➡️ River Crossing ➡️ Kem Sungai Durian ➡️ Gunung Chondong Gelinting ➡️ Kem Dengkur ➡️ Gunung Tumang Batak ➡️ Kem Pisang ➡️ Kem Duit ➡️ Gunung Liang ➡️ Kem 7E ➡️ Gunung Behrang ➡️ Kem Lubuk Hantu ➡️ Trail Head ➡️ Car Park
Trail Head Information:
🚩 Located at Behrang, Perak
🚩 Level of Difficulty: Very Hard 8/10
🚩 Start and ended at diffferent trail head
🚩 Elevation: 1,933 meter
🚩 Trans hiking 33.30 KM in 20 hours
Note:
✴️ Compress day hike. Very difficult. Not for beginner.
✴️ Water point available. Bring 2 litre of water and enough food
✴️ Leeches 🤪
✴️ Need to arrange transport at both side. Either park at both end or ferry by 4WD
List of Mountains:
⛰️ Gunung Chondong Gelinting 1,829 meter
⛰️ Gunung Tumang Batak 1,636 meter
⛰️ Gunung Liang (East & West) 1,933 meter
⛰️ Gunung Behrang 1,500 meter
Time Log:
✳️ 0400 : Meet up
✳️ 0430 : 4WD transferred 🛻
✳️ 0513 : Start
✳️ 0533 : River Crossing*
✳️ 0736 : Con't hike
✳️ 0928 : Kem Sungai Durian 💧
✳️ 1244 : G. Chondong Gelinting ⛰️
✳️ 1257 : Continue
✳️ 1428 : Kem Dengkur 💧⛺
✳️ 1636 : Gunung Tumang Batak ⛰️
✳️ 1731 : Kem Pisang (LWP) 💧
✳️ 1835 : Kem Duit
✳️ 2003 : Gunung Liang East & West ⛰️
✳️ 2028 : Continue
✳️ 2154 : Kem 7E 💧⛺
✳️ 2321 : Gunung Behrang ⛰️
✳️ 2353 : Kem Lubuk Hantu 💧⛺
✳️ 0112 : Trail Head ~ End
✳️ 0118 : Car Park**
Remark:
* Stuck at river side for 2 hours due to high tide. Too dangerous. Waiting for water to recede
** Walk another 6 minutes back to car park
Trans Slim 出发前低估了她的难度,以为并没想象中的那么难。哪知误判了 🤣😂,比起 V1 两者不相上下。
由于是Trans, 必须把车停放两旁。而这次我们安排四轮驱动车载送前往Chondong Gelinting登山口。一开始就一直爬升了直到山顶。但走了大约半小时就卡在了河边,由于涨潮无法度河,只好在地休息。两小时退朝后,大伙决定继续前进。
从Chondong Gelinting 到达 Tumang Batak,需要走约四小时。一直很向往攀顶的山峰,今天终于拿下了。休息填饱肚子后再前往下个山顶Gunung Liang 。从这里开始大雨就不停的一直下,转说梁山路线每到下午四点就会下雨,果然神准。
三小时半后晚上八点终于攻顶了,这时天已暗进入了晚间。此时衣服全湿,天气又非常的冷,十分难受。拍完照后我们就继续出发了,赶在凌晨抵达登山口。差不多走了四小时才抵达最后一个营地 Kem Lubuk Hantu 。眼看着手表显示2353 hrs。。。天啊!!!
无奈的继续前行。。。走着走着一小时后听到了一股很强的流水声,终于抵达了梁山登山口。叹了一口气,以最快的速度回到了停车场,结束了此次被低估的不平凡之旅。
Trail Head Location:
🌐 Sungai Gelinting Water Treatment Plant
🌐 GPS: 3.890812, 101.52517
Permit & Guide:
📝 Permit: Compulsory.
🥷 Guide: Compulsory. 1:7 ratio. Engage with Guide and he will arrange permit
🐺 12 line up. Guide by Zack, event by Rui Peng
📮 hikefuntw@gmail.com
🏁 Saturday, 16 September 2023
Waypoints
Trail Head
0513 | Park our car at Gunung Liang trail head & transferred by 4WD to Gunung Chondong Gelinting trail head. 4WD drive distance about 30 minutes
River Crossing
0533 hrs | Stuck at river for 2 hrs+ due to rising tide, too dangarois can't cross river ver. No other alternative have to wait here until water recede. 由于河水涨潮无法度河,在此逗留约两小时。 🖼️ 3/6: 0731 hrs manage to crossed after 2 hours of waiting
Tortoise
Impressed Tortoise The impressed tortoise occurs in mountainous forest areas in SEA, mainly in Myanmar, Southern China, Thailand, Laos, Vietnam, Cambodia, Malaysia & Northern India. The species has a golden brown shell and skin. - wikipedia
Kem Sungai Durian
0928 hrs | Reached. Regroup and break. 🖼️ 4/6: Crossing river (won't getting wet)
Kem Dengkur
Reached 1428 hrs Small Camp site. Can accommodate about 6 tents. Not an ideal camping area
Car Park
Reached 0118 hrs From trail head walk for another 6 minutes and ended our hike here. Can wash and shower here beside river
You can add a comment or review this trail
Comments